Duisburg Hochfeld (DE) natural gas

Project name/location: Natural gas CHP Duisburg Hochfeld (DE)

Commissioning: 2018 + 2023

Engine make/type: MWM 1x TCG2020V12 1MW + 7x TCG2032V16 4,5MW + 2x TCG2032V16 4,5MW

Secondary plant: 1x electric boiler 30 MWth (iKWK project)

Fuel: natural gas

Electrical power: 1 x 1000 kW + 7x 4500 kW + 2x 4500 kW

Thermal power: 1x 1120 kW + 7x 4600 kW + 2x 4600 kW

Type of construction: natural gas built-in modules