Project name/Location: CHP Ratingen, Germany
Commissioning: 2022
Engine manufacturer: MWM / MTU
Performance:
- 2x MWM TCG2020V20: 2,000 kWel, 1,938 kWth, 4,590 kW fuel heat input
- 2x MTU 16V4000L64FNER: 2,000 kWel, 2,034 kWth, 4,534 kW fuel heat input
Scope of delivery by ETW:
- Dismantling and disposal of existing plants
- Grid-parallel operation
- Heat extraction
- Building installation with noise protection enclosure
- Exhaust gas cleaning system and urea supply
- Fuel and lubricating oil supply
- Emergency mixture cooling for the CHP plant
- Full-service and maintenance contract
As part of the project, an existing plant was completely dismantled and replaced by a modern CHP solution. Two MWM TCG2020V20 and two MTU 16V4000L64FNER engines, each with 2,000 kWel, are now in operation, ensuring reliable and efficient power generation.
In addition to the installation of the four units, the project included the renewal of the entire control system with central control panel and integration into the control room, the adaptation of the exhaust gas and noise protection systems, as well as the integration of fuel, ventilation, and heat extraction systems. The lubricating oil supply and mixture cooling were also newly set up. The project is complemented by a long-term maintenance contract, ensuring safe and economical operation.