Project name/location: Biomethane plant Stammheim, Germany
Type: Biomethane plant for processing 800 m³/h of sewage gas
Commissioning: 2024
Design: ETW biomethane plant based on the principle of pressure swing adsorption
The biomethane plant is capable of processing sewage gas with a methane content (CH₄) of over 65% and a carbon dioxide content (CO₂) of less than 35%. This requires precise and efficient gas upgrading technology to prepare the gas for use in energy production or other industrial applications.
Another remarkable feature of the plant is its wide operating range, spanning from 160 m³/h to 800 m³/h. This flexibility allows the system to respond to varying gas volumes and qualities and to operate efficiently according to demand.
