Project name/location: Biomethane plant Lethbridge, Canada
Type: Biomethane plant for upgrading 1900 m³/h of raw biogas to 1130 m³/h of bio natural gas for injection into the natural gas grid
Commissioning year: 2021
Design: ETW biomethane plant based on the principle of pressure swing adsorption (PSA)
The planning and implementation of the project placed high demands on the technical equipment and plant concept. A particular challenge was the extreme ambient temperature range, fluctuating between -40°C and +40°C. To ensure operational safety and efficiency under these conditions, the entire plant technology was installed in a closed enclosure.
In addition, the complete execution of the upgrading plant was carried out in accordance with strict ASME and UL standards. This ensures that the plant meets international safety and quality requirements.