CHP Duisburg Mitte

CHP Plant Duisburg Mitte, Germany – Natural Gas

Project name/location: Duisburg Mitte CHP 1+2+3

Commissioning: 2018 and 2024

Engine manufacturer: 9x MWM TCG2032BV16 + 1x MWM TCG2020V12

Auxiliary unit: 1x electric boiler 30 MW (power-to-heat)

Fuel: Natural gas

Electrical output: 9x 4,500 kW + 999 kW

Thermal output: 9x 4,600 kW + 1,120 kW

A particular challenge was the installation of the units into the existing building across four levels, at heights of up to 20 meters.

The general contractor scope of delivery by ETW also included the construction of the foundation with 36 bored piles, the machine enclosure, steel structure, and the CHP plant technology including the medium-voltage switchgear, the connection to the 110 kV transformer, and the integration into the district heating network of the city of Duisburg.