BMA 1400 m³/h Nonnendorf-DE

ETW Biomethane plant

Reliable: Biomethane plant Nonnendorf (DE)

Project/Site: Biomethane Plant Nonnendorf (DE)

Startup: 2015

Type: Biomethane plant concentrating 1400 m³/h raw biogas up to 700 m³/h biomethane to be feeded into the public natural gas grid

Module type: ETW Biomethane Plant with a pressure swing adsorption unit (PSA) with a layered carbon molecular sieve.